The site uses prefabrication to reduce nuisance. The proximity of the boarding school construction site to the lycée’s teaching areas meant that acoustic pollution had to be kept under control. The load-bearing structure is made of precast concrete, while the non-load-bearing facades are timber-framed. A technique without thermal bridges was chosen: Ossabois.
There’s more to project performance than that:
Main contractor: Vincent Bourgoin Architecte
Contractors: Bouygues (Clos-Couvert); Neyrat / CroixMarie (Finishes / Interior joinery); Gallier (HVAC); SPIE (electricity); Eiffage TP (Exterior fittings)