The Fort d’Issy-les Moulineaux (92) swimming pool, Aquazena, opened its doors on July 18, 2015. Designed by Mikou Studio architects, the curvaceous project blends into the Quartier du Fort and respects the rules of Feng-Shui.
The environmental design of the facility was carried out by TRANS-FAIRE (BET HQE project management), to optimize interior comfort (lighting, acoustics, etc.), reduce energy and water consumption, limit health risks (drastic reduction in chlorine use)…

The project’s environmental features include